Yazoo River Basin Reservoirs

26 FEB 2017

Reservoir
Time 
Pool Elevation
24 Hour change
Discharge
(cfs)
Guide Curve Elevation
Above / Below Guide Curve
Percent Full
Inches of Runoff Available
Total Project Runoff
Arkabutla 2/26 @ 0200
212.65
-.04
271
210.0
2.6
4.1
8.8
9.3
Sardis 2/26 @ 0200
241.52
.03
794
241.0
.5
4.8
16.8
17.7
Enid 2/26 @ 0200
234.82
.05
119
235.0
-.2
5.7
19.1
20.2
Grenada 2/26 @ 0200
200.40
-.06
466
198.0
2.4
7.4
16.5
17.8

For a table showing the last 24 hours of hourly stages click here

Ouachita River Basin Reservoirs
26 FEB 2017
Reservoir
Time Pool Elevation
24 Hour change
Power Pool Elevation
Above / Below Power Pool
Percent Full
Inches of Runoff Available
Total Project Runoff
Blakely 2/26 @ 0200 571.83
-.01
578.1
-6.3
0.0
10.5
10.5
DeGray 2/26 @ 0200 406.07
.06
408.0
-1.9
0.0
9.4
9.4
Narrows 2/26 @ 0200 541.01
.08
548.0
-7.0
0.0
10.1
10.1

For a table showing the last 24 hours of hourly stages click here

Red River Basin Reservoirs
26 FEB 2017
Reservoir
Time
Pool Elevation
24 Hour change
Discharge
Percent Full
Inches of Runoff Available
Total Project Runoff
Caddo 2/26 @ 0200
169.59
-.13
3,193
----
----
----
Bodcau 2/26 @ 0200
165.17
-.15
820
2.3
10.0
10.2
Wallace 2/26 @ 0200
140.95
-.05
0
0.0
6.4
6.4
Cypress Lake 2/26 @ 0200 179.64 -.06 8 ---- ---- ----

For a table showing the last 24 hours of hourly stages click here