Yazoo River Basin Reservoirs

25 MAR 2017

Reservoir
Time 
Pool Elevation
24 Hour change
Discharge
(cfs)
Guide Curve Elevation
Above / Below Guide Curve
Percent Full
Inches of Runoff Available
Total Project Runoff
Arkabutla 3/25 @ 1100
211.85
.03
418
210.0
1.9
3.0
8.9
9.3
Sardis 3/25 @ 1100
245.70
.10
102
246.8
-1.1
9.6
16.0
17.7
Enid 3/25 @ 1100
237.65
.13
65
239.0
-1.4
9.8
18.2
20.2
Grenada 3/25 @ 1100
203.53
.08
84
203.3
.2
11.8
15.7
17.8

For a table showing the last 24 hours of hourly stages click here

Ouachita River Basin Reservoirs
25 MAR 2017
Reservoir
Time Pool Elevation
24 Hour change
Power Pool Elevation
Above / Below Power Pool
Percent Full
Inches of Runoff Available
Total Project Runoff
Blakely 3/25 @ 0900 572.28
.32
578.1
-5.8
0.0
10.5
10.5
DeGray 3/25 @ 1100 408.24
.33
408.0
.2
1.4
9.3
9.4
Narrows 3/25 @ 1100 541.93
.46
548.0
-6.1
0.0
10.1
10.1

For a table showing the last 24 hours of hourly stages click here

Red River Basin Reservoirs
25 MAR 2017
Reservoir
Time
Pool Elevation
24 Hour change
Discharge
Percent Full
Inches of Runoff Available
Total Project Runoff
Caddo 3/25 @ 1100
169.66
.17
3,382
----
----
----
Bodcau 3/25 @ 1100
165.13
-.05
816
2.3
10.0
10.2
Wallace 3/25 @ 1100
140.49
.04
0
0.0
6.4
6.4
Cypress Lake 3/25 @ 1100 179.60 .02 0 ---- ---- ----

For a table showing the last 24 hours of hourly stages click here